In excavation and septic installation, handling material twice eats margins fast: strip the topsoil, load it onto trucks, haul it to a processing yard, and pay to truck screened material back in. For pipe work, crews spend valuable hours hand-shoveled bedding around utilities while dodging rocks rolling down trench walls.
For Jake Willis and Todd Willis of Connecticut-based New London County Septic & Excavation (NLCSS), breaking that cycle came down to bringing the screening plant directly to the trench using Gyru-Star Compact Screening Buckets.
The Challenge: Boulders, Ledge, and Double-Handled Fill
Operating across southeastern Connecticut means working in unpredictable, punishing ground. Glacial erratics, ledge, and hardpan dominate site work.
Before introducing screening buckets to their fleet, NLCSS’s standard workflow required hauling out 40 to 50 yards of material per residential job, raking down sites with skid-steer power rakes, and buying imported fill. Pipe bedding added another layer of labor and imported material cost to ensure water and sewer lines met strict local bedding specifications.
The Solution: Rapid On-Site Processing
Working with Eric Ransome at Ransome Attachments, NLCSS equipped their carrier fleet with three Gyru-Star models set up for fast, cab-controlled swapping via OilQuick couplers and tiltrotators:
- Komatsu PC88s: Equipped with a Gyru-Star 3-100HE and the new Gyru-Star 3-100MAX (paired with Rototilt tiltrotators).
- Komatsu PC138: Paired with a high-capacity Gyru-Star 5-120HE (and a Steelwrist tiltrotator).
Because the custom head brackets match their quick-coupler setup, swapping from a digging bucket to a screening bucket takes under 30 seconds with zero manual hydraulic connections.
Where It Pays Off: Pipe Bedding & Finished Topsoil
- Instant Pipe Bedding: Instead of purchasing and hauling pipe sand to meet municipal requirements (6 inches below, 12 inches above), operators screen material directly into the trench over the pipe, eliminating hand-shoveling and protecting lines immediately.
- Topsoil Retention: Instead of paying dump fees and backhaul freight, 40+ yards of soil stay on site. Operators process clean finish grade at 30 to 45 tons per hour with the 3-100 series, while the 5-120HE handles up to 120 tons per hour in dry material.
- Polyurethane Star Durability: In four years of operation in rocky ground, NLCSS found the flexible polyurethane star design deflected and bounced rocks cleanly without excessive wear.
Full Editorial Coverage
This field breakdown was originally reported by Brian Fraley for Construction Equipment Guide. You can read the complete profile and contractor interview on Construction Equipment Guide.